In July 2025, Fibreglaze restored the north and south resort pool basins on the level-three pool deck at Pullman Cairns International. The existing Marblesheen surface showed extensive wear and staining, areas of delaminated render, localised rust-affected patches and failure around the waterline tile band associated with expansion cracking.
Across approximately 450 m², the pools were acid washed and mechanically prepared before localised defects were treated, repaired and levelled with resin-based filler screed. The waterline tile band was incorporated into the new surface, followed by a vinyl ester fibreglass laminate and AquaGuard Dove Grey Speckle finish.
The project also included ten new white in-wall pool lights, two resurfaced island tops, eight custom in-pool pod seats and a formed infill to the spa-waterfall structure. The works were coordinated with the hotel project team, builder, designer and electrical trades as part of the wider pool-deck refurbishment.
These photographs follow the work from the pool’s original condition through preparation and repair to the completed finish.
Everything looked and felt very good, including the step-tread grip. (July 2025)
The Pullman pool continues to look excellent. (March 2026)
These were the main pool conditions recorded for this project. Select an issue to learn more about its common signs, possible causes and repair considerations.
Send us a few photos and our team can help identify the likely issue and the most suitable next step.