Moree Plains Shire Council engaged Fibreglaze to resurface the active and passive artesian pools at the Moree Artesian Aquatic Centre. Together, the two concrete pools included approximately 415 m² of floors, walls, benches, steps, ramp and perimeter gutters.
The work was staged over separate one-week visits in December 2025 and January 2026. Each substrate was ground and levelled before a fibreglass laminate and two AquaGuard topcoats were applied, finished in Lagoon Blue Speckle with a non-slip treatment and contrasting tread indicator lines.
These photographs follow the work from the pool’s original condition through preparation and repair to the completed finish.