Finish :
Pool Type :
Location :
Size :
In August 2024, Fibreglaze delivered a coordinated repair program for Quilpie Shire Council across the Eromanga and Quilpie aquatic centres. At Eromanga, failed backfill and groundwater pressure had deformed sections of the 20 x 6 m, three-piece moulded fibreglass pool shell, with osmosis also identified.
Council’s civil works team demolished a portion of the surrounding concrete pavement and excavated behind the deformed pool shell walls. Fibreglaze then repaired and pressure-tested exposed plumbing, realigned and reinforced the deformed walls, treated osmosis, and resurfaced the pool with the Enduratec system. Fibreglaze also supervised the staged engineered backfill reinstatement simultaneous with the pool refilling to ensure the rectified shell remained aligned.
These photographs follow the work from the pool’s original condition through preparation and repair to the completed finish.
These were the main pool conditions recorded for this project. Select an issue to learn more about its common signs, possible causes and repair considerations.
Send us a few photos and our team can help identify the likely issue and the most suitable next step.